Building Permit
Building Permit
The objectives of this procedure are:
a) To verify that the projected building is in accordance with the standards and regulations in force.
b) Issue the Building Permit (BP-003)
a) To verify that the projected building is in accordance with the standards and regulations in force.
b) Issue the Building Permit (BP-003)
Building Permit (For Medium and High-risk Projects located in Industrial Areas)
The objectives of this procedure are:
a) To verify that the projected building is in accordance with the standards and regulations in force.
b) Issue the Building Permit (BP-003)
Apply Nowa) To verify that the projected building is in accordance with the standards and regulations in force.
b) Issue the Building Permit (BP-003)