Building Permit

Building Permit

The objectives of this procedure are:
a) To verify that the projected building is in accordance with the standards and regulations in force.
b) Issue the Building Permit (BP-003)

Building Permit (For Medium and High-risk Projects located in Industrial Areas)

The objectives of this procedure are:
a) To verify that the projected building is in accordance with the standards and regulations in force.
b) Issue the Building Permit (BP-003)
Apply Now