Building Categorization Matrix
Building Categorization Matrix
Construction Risks
PLOT RISKS (PR)
STRUCTURAL RISKS (SR)
CONSTRUCTION RISK LEVEL
Low: 4 < 8
Medium: 8 < 12
High: 12 < 30
4.0 LOW
Occupant Load Calculation Sheet
Reference: Table 2.6.1. of the National Myanmar Building Code
Occupancy type | Floor Area in sq-feet per person | Type of area | Total area (in sqf) | Total number of occupants | |
---|---|---|---|---|---|
1 | Accessory storage areas, mechanical ,equipment room | Gross | |||
2 | Agricultural building | Gross | |||
3 | Aircraft Hangars | Gross | |||
4 | Airport Terminal | ||||
4.1 | Baggage claim | Gross | |||
4.2 | Baggage handling | Gross | |||
4.3 | Concourse | Gross | |||
4.4 | Waiting areas | Gross | |||
5 | Assembly, Gaming floors (keno, slots, etc.) | Gross | |||
6 | Assembly with fixed seats | Nr of seats + wheel chair space | |||
7 | Assembly without fixed seats | ||||
7.1 | Concentrated (chairs only-not fixed) | Net | |||
7.2 | Standing space | Net | |||
7.3 | Unconcentrated (tables and chairs) | Net | |||
8 | Bowling centers | Net | |||
9 | Business areas (Offices, etc.) | Gross | |||
10 | Courtrooms-other than fixed seating areas | Net | |||
11 | Day Care | Net | |||
12 | Dormitories | Gross | |||
13 | Educational | ||||
13.1 | Classroom area | Net | |||
13.2 | Shops and other vocational room areas | Net | |||
14 | Exercise rooms | Gross | |||
15 | Fabrication and manufacturing areas | Gross | |||
16 | Industrial areas | Gross | |||
17 | Instutitional areas | ||||
17.1 | Inpatient treatment areas | Gross | |||
17.2 | Outpatient areas | Gross | |||
17.3 | Sleeping areas | Gross | |||
18 | Commercial Kitchen | Gross | |||
19 | Library | ||||
19.1 | Reading rooms | Net | |||
19.2 | Stack area | Gross | |||
19.3 | Locker rooms | Gross | |||
20 | Commercial | ||||
20.1 | Areas on other floors | Gross | |||
20.2 | Basement and grade floor areas | Gross | |||
20.3 | Storage, stock, shipping areas | Gross | |||
21 | Parking Garages | Gross | |||
22 | Residential | ||||
Total area | Grosss | ||||
OR | |||||
Total number master bedroom | |||||
Total number single bedroom | |||||
Total number maid bedroom | |||||
23 | Skating rinks, swimming pools | ||||
23.1 | Rink and pool | Gross | |||
23.2 | Decks | Gross | |||
24 | Stages and Platforms | Net | |||
25 | Warehouses | Gross | |||
Maximum Premise Occupancy Rate |
Gross floor area of a building, means the total floor area calculated based on a center of exterior walls, including the circulation areas such as stairs, corridors, etc. but excluding the shafts, ducts, lift wells, etc. (MNBC, chapter 2.3.3., Occupancy Load)
Use Risks
Occupancy Capacity
Type of Occupancy
Assembly
Type of occupancy | % | Coefficient | Grade of risk (from 1 to 5) | Area |
---|---|---|---|---|
Business
Educational
Factories and Industrial
High Hazardous
Institutional
Mercantile
Residential
Storage
Utility and Miscellaneous
100.0%
|
OK
|
USE RISK LEVEL
Low: 2 < 12
Medium: 12 < 40
High: > 40
10.0 Low
Definition of the Final Category
Construction risk level | ||||
L | M | H | ||
Use risk Level | L | 1 | 2 | 2 |
M | 2 | 2 | 3 | |
H | 3 | 3 | 3 |
BUILDING PERMIT CATEGORY
LOW
Documentation to Prepare for the Application
CONSTRUCTION RISK
HIGH
USE RISK
LOW
DOCUMENTATION FOR LOW RISK PROJECT TO PRESENT FOR THE BUILDING PERMIT
- Application form for building permit
- Power of attorney (if needed)
- Declaration of responsibility of the applicant
- Declaration of responsibility from the certified professional in charge of the architectural design
- Declaration of responsibility signed by the Certified Professional in charge of the construction
- Copy of the National Registration Card of the applicant (NRC)
- Copy of the D-Map and grant or evidence of Land Ownership
- Suggestion letter of the Street and Bridges Task Force (if needed)
- Architectural drawings
- Photo report of the existing environment of the projected building
- Suggestion letter of the Fire Service Department (if building concerned by the section 17 of the Myanmar Fire Force law)
DOCUMENTATION FOR MEDIUM RISK PROJECT TO PRESENT FOR THE APPROVAL IN PRINCIPLE
- Application form for building permit
- Power of attorney (if needed)
- Declaration of responsibility of the applicant
- Declaration of responsibility from the certified professional in charge of the architectural design
- Copy of the National Registration Card of the applicant (NRC)
- Copy of the D-Map and grant or evidence of Land Ownership
- Suggestion letter of the Street and Bridges Task Force (if needed)
- Architectural drawings
- Photo report of the existing environment of the projected building
- Traffic Impact Assessment (if necessary)
- Environment Compliance Certificate including the DNI (if necessary)
DOCUMENTATION FOR HIGH RISK PROJECT TO PRESENT FOR THE APPROVAL IN PRINCIPLE
- Application form for building permit
- Power of attorney (if needed)
- Declaration of responsibility of the applicant
- Declaration of responsibility from the certified professional in charge of the architectural design
- Copy of the National Registration Card of the applicant (NRC)
- Copy of the D-Map and grant or evidence of Land Ownership
- Suggestion letter of the Street and Bridges Task Force (if needed)
- Architectural drawings
- Photo report of the existing environment of the projected building
- Traffic Impact Assessment (if necessary)
- Environment Compliance Certificate including the DNI (if necessary)
Additional documentation
NO ADDITIONAL DOCUMENTATION REQUIRED
If the low risk project is concerned by the section 17 of the Myanmar Fire Force Law, a suggestion letter will have to be provided
Additional Documentation for Medium risk project to present for the building permit
Administrative | Declaration of responsibility signed by the Certified Professional in charge of the structure design |
Declaration of responsibility signed by the Certified Professional in charge of the construction | |
Declaration of responsibility signed by the Certified Professional in charge of the water supply and sanitation | |
Declaration of responsibility signed by the Certified Professional in charge of the deep excavation design (if needed) | |
Declaration of responsibility signed by the piling company (if needed) | |
Theodolite Reading of the adjacent buildings(If the adjacent building is above 3 storey) | |
Graphical | Updated drawings (architecture and structure) |
Structural calculations and soil test | |
Water connection and sanitation designs | |
Suggestion letter of the Fire Service Department | |
Approved drawings from the Fire Services Department | |
Persons with Reduced Mobility (PRM) Study (if needed by the chapt. 2.7. of the MNBC) |
Do you require a Licensed Contractor (LC) to execute the works ?
YES