Requirement

Requirement

BCM category Required to process - Request inspection for commencement of Building Request inspection for floor by floor construction Request Final Inspection for BCC
Approval in Principle Building Permit
Low Risk Project No Yes Yes Yes Yes
Medium Risk Project Yes Yes Yes Yes Yes
High Risk Project Yes Yes Yes Yes Yes
Required Documents for Low Risk Category Project to apply Building Permit
1 Application form for Building permit (online fill-up)
2 Power of attorney (if needed)
3 Declaration of Responsibility of the applicant
4 Declaration of Responsibility signed by the certified professional in charge of the architectural design
5 Declaration of responsibility signed by the Certified Professional in charge of the construction
6 Copy of the National Registration Card of the applicant (NRC)
7 Copy of the D-Map issued by land department within 3 years and Grant or evidence of Land Ownership
8 Suggestion letter of the Street and Bridges Task Force (if needed)
9 Architectural drawings
10 Photo report of the existing environment of the projected building
11 Suggestion letter of the Fire Service Department (if building concerned by the section 17 of the Myanmar Fire Force law)
Required Documents for Low Risk Category Without D-Map Project to apply Building Permit
1 Application form for Building permit (online fill-up)
2 Power of attorney (if needed)
3 Declaration of Responsibility of the applicant
4 Declaration of Responsibility signed by the certified professional in charge of the architectural design
5 Declaration of responsibility signed by the Certified Professional in charge of the construction
6 Copy of the National Registration Card of the applicant (NRC)
7 Copy of the land purchase agreement
8 Clearance letter from Ward office on no disputes of tenant and landlord
9 Consent letter from adjacent land owners
10 Suggestion letter of the Street and Bridges Task Force (if needed)
11 Architectural drawings
12 Photo report of the existing environment of the projected building
13 Suggestion letter of the Fire Service Department (if building concerned by the section 17 of the Myanmar Fire Force law)
Required Documents for Medium Risk Category Project to apply Approval in Principle
1 Application form for Building permit (online fill-up)
2 Power of attorney (if needed)
3 Declaration of Responsibility of the applicant
4 Declaration of Responsibility signed by the certified professional in charge of the architectural design
5 Copy of the National Registration Card of the applicant (NRC)
6 Copy of the D-Map issued by land department within 3 years and Grant or evidence of Land Ownership
7 Suggestion letter of the Street and Bridges Task Force (if needed)
8 Architectural drawings
9 Photo report of the existing environment of the projected building
10 Traffic Impact Assessment Report (if needed)
11 Environment Compliance Certificate (if needed)
12 Theodolite Reading of the adjacent buildings(If the adjacent building is above 3 storey)
Required Documents for Medium Risk Category Project to apply Building Permit after getting Approval in principle
1 Declaration of responsibility signed by the Certified Professional in charge of the structure design
2 Declaration of responsibility signed by the Certified Professional in charge of the construction
3 Declaration of responsibility signed by the Certified Professional in charge of the water supply and sanitation
4 Declaration of responsibility signed by the Certified Professional in charge of the deep excavation design (if needed)
5 Declaration of Responsibility signed by the piling company (if needed)
6 Updated drawings (architecture and structure)
7 Structural calculations and soil investigation report
8 Water connection and sanitation designs
9 Suggestion letter of the Fire Service Department
10 Approved drawings from the Fire Services Department
11 Persons with Reduced Mobility (PRM) Study (if needed by the chapt. 2.7. of the MNBC)
Required Documents for High Risk Category Project to apply Approval in Principle
1 Application form for Building permit (online fill-up)
2 Power of attorney (if needed)
3 Declaration of Responsibility of the applicant
4 Declaration of Responsibility from the certified professional in charge of the architectural design
5 Copy of the National Registration Card of the applicant (NRC)
6 Copy of the D-Map issued by land department within 3 years and Grant or evidence of Land Ownership
7 Suggestion letter of the Street and Bridges Task Force (if needed)
8 Architectural drawings
9 Photo report of the existing environment of the projected building
10 Traffic Impact Assessment Report (if needed)
11 Environment Compliance Certificate (if needed)
Required Documents for High Risk Category Project to apply Building Permit after getting Approval in principle
1 Declaration of responsibility signed by the Certified Professional in charge of the structure design
2 Declaration of responsibility signed by the Certified Professional in charge of the construction
4 Declaration of responsibility signed by the Certified Professional in charge of the electrical study
5 Declaration of responsibility signed by the Certified Professional in charge of the mechanical study (if needed)
6 Declaration of responsibility signed by the Certified Professional in charge of the water connection and sanitation
7 Declaration of responsibility signed by the Certified Professional in charge of the ACMV study (if needed)
8 Declaration of Responsibility signed by the Certified Professional in charge of the deep excavation design (if needed)
9 Declaration of Responsibility signed by the piling company (if needed)
10 Theodolite Reading of the adjacent buildings(If the adjacent building is above 3 storey)
11 Updated drawings (architecture and structure)
12 Structural calculations and soil investigation report
13 Mechanical drawings (if needed)
14 Electrical drawings and calculation report
15 Water supply and sanitation drawings
16 ACMV drawings
17 Suggestion letter of the Fire Service Department
18 Updated architectural designs approved by the Fire Service Department
19 Persons with Reduced Mobility (PRM) Study (if needed by the chapt. 2.7. of the MNBC)
Required Documentation for Building Completion Certificate (Low Risk)
1 As Built Architectural & Structural Drawing
2 Declaration of Responsibility signed by the certified professional in charge of the Structural design (if needed)
3 Recommendation Letter of Assessor Department
4 Fire Safety Certificate (FSC) of Fire Service Department (if building concerned by the section 17 of the Myanmar Fire Force law)
5 Recommendation Letter of Industrial Supervision and Inspection Department (Only For Buildings Containing Lift)
6 Photo report of Proposed building (Front, Back, Left & Right)
Required Documentation for Building Completion Certificate (Medium Risk)
1 As Built Architectural & Structural Drawing
2 Water and Sanitation Designs Drawings
3 Theodolite Reading of Proposed building
4 Recommendation Letter of Assessor Department
5 Fire Safety Certificate (FSC) of the Fire Service Department (if building concerned by the section 17 of the Myanmar Fire Force law)
6 Recommendation Letter of Industrial Supervision and Inspection Department (Only For Buildings Containing Lift)
7 Recommendation Letter of Yangon Electricity Supply Corporation (If the transformer has been installed)
8 Recommendation Letter of Internal Revenue Department
9 Photo report of Proposed building (Elevations of the Building, M& E space, Septic Tank, Drains)
Required Documentation for Building Completion Certificate (High Risk)
1 As Built Architectural & Structural Drawing
2 Water and Sanitation Designs Drawings
3 Electrical Designs Drawings
4 Mechanical Design Drawings
5 CMV Design Drawings
6 Theodolite Reading of Proposed building
7 Recommendation Letter of Assessor Department
8 Fire Safety Certificate (FSC) of the Fire Service Department (if building concerned by the section 17 of the Myanmar Fire Force law)
9 Recommendation Letter of Industrial Supervision and Inspection Department (Only For Buildings Containing Lift)
10 Recommendation Letter of The Yangon Electricity Supply Corporation (If the transformer has been installed)
11 Recommendation Letter of Internal Revenue Department
12 Photo Report (Elevations of the Proposed building, Septic Tank, M&E Space, Drain)
Required Documents for Minor Building Works and Temporary Structural Approval
1 Application form (online fill-up)
2 Power of attorney in the case there is an agent acting on behalf of the applicant / land owner
3 Declaration of responsibility of the applicant
4 Declaration of responsibility of the certified professional in charge of the architectural design
5 Copy of the National Registration Card of the applicant
6 Copy of the D-Map and Grant or evidence of ownership  Recommendation letter of land owner for apartment
7 Architectural Drawing (For repairing or renovation work, need to color the repairing or renovation portion)
8 Photo reportage
Required Documents for Technical Administrative Information Sheet
1 Application form (online fill-up)
2 Flat rate receipt of 50,000 Kyats for the TAIS
3 Power of attorney in the case there is an agent acting on behalf of the applicant / land owner
4 Location map of the plot
5 Evidence of land ownership
6 Copy of the NRC card of the applicant
7 Brief about the projected development
8 Copy of the technical documents related to the project (if any)
Required Documents for Demolition Permit
1 Application form (online fill-up)
2 Power of attorney in the case there is an agent acting on behalf of the applicant / land owner
3 Copy of Grant or evidence of land ownership
4 Copy of the National Registration Card of the applicant
5 Photo report of the existing environment of the building to be demolished
6 Declaration of responsibility of the certified professional in charge of supervising the demolition works
7 Declaration of responsibility of the applicant
Others related information
1 Drawing checklistsUpdated on: 25th Nov 2019   Download here File size: 264kb
2 Declaration of Responsibility of the applicant/ Land ownerUpdated on: 28th Dec 2023   Download here File size: 186kb
3 Declaration of Responsibility of the Certified ProfessionalUpdated on: 28th Dec 2023   Download here File size: 191kb
4 Building permit application form Sample (as the reference)Updated on: 24th Sep 2019   Download here File size: 996kb
5 Sample Drawing(Architectural Drawing)Updated on: 21st Jan 2020   Download here File size: 6080kb
6 Sample Drawing of SPT with Treatment System(Water Sanitation)Updated on: 6th Apr 2020   Download here File size: 5597kb
7 Sample Drawing of Upflow System(Water Sanitation)Updated on: 6th Apr 2020   Download here File size: 5661kb
8 Noticeable Information for drawing preparationUpdated on: 21st Jan 2020   Download here File size: 83kb
9 YBPS ManualUpdated on: 20th Oct 2020   Download here File size: 4876kb
10 MPU Payment ManualUpdated on: 28th Apr 2020   Download here File size: 349kb
Payment required When applying for -
Approval in Principle Building Permit Final inspection for BCC
Low Risk Project No Yes Yes
Medium Risk Project Yes Yes Yes
High Risk Project Yes Yes Yes
BCM category Service fees for scrutinizing the project When applying for -
Approval in Principle Building Permit Final inspection for BCC
Low Risk Project 55 MMK per sq. ft N/A 100% 25% of total BCA - building permit fees
Medium Risk Project 75 MMK per sq. ft 10% 90% 25% of total BCA - building permit fees
High Risk Project 85 MMK per sq. ft 10% 90% 25% of total BCA - building permit fees
When required to check by HPBC 100 MMK per sq. ft N/A 100% N/A